Workplace | Our Past | Our Methods | Equipment Used Building of vessel
The building of our vessel Megan (45.3k)
vessel ready to go Vessel, almost ready for use (73k)
Megan, ready to be dipped for the first time (62k)
new vessel, ready to go
Loaded punt Loaded punt at the Smithton Depot (55.1k)
2 of our vessels up at the lease (64k)
2 of our vessels
Testing out Megan Testing our Megan in rough conditions
Anne Marree loaded to the top
loaded vessel
Purpose built sorter One of our purpose built sorters (50k)
The catcher of our sorter   Sorter catcher